Getting ready to PSC home and want to ensure the boat will be good to go when it finally arrived back home, good ole Texas for a month then off to Norfolk.
Engine preps, hull or shaft requirements. I have to much time and effort in this to have if be stuck and not running when it arrives.
Military shippments last from 30 to 55 days to get across the pond. Ideas and requirements advice needed.
Thanks,
Engine preps, hull or shaft requirements. I have to much time and effort in this to have if be stuck and not running when it arrives.
Military shippments last from 30 to 55 days to get across the pond. Ideas and requirements advice needed.
Thanks,