unclecrash
Well-Known Member
- Joined
- Sep 14, 2006
- Messages
- 99
I am working on getting my avenger going with an andy brown modded ops 90.It will be running 50% nitro and am wondering what length to start at with the pipe. From plug to weld. Also where are you guys putting the pressure tap on the pipe by the weld or down on the header manifold so the silicone tube isnt running so far and looking like crap.