- Joined
- Sep 5, 2007
- Messages
- 1,608
unfortunetly i cannot finish this boat,,i had steve do the 2 upright fins and the horizontal fin,,glued and installed,,fit and install the cowl with cowl lock,,windshield is screwed on,,engine mount blocks are glued in,,drain holes and water lines are in,,extra carbon fiber in the bottom,,sponsons,,transom,,has the stabilizer kit installed for the fins,,2 10 oz fuel cells built in next to the engine,,comes with new accu-tech hardware,,strut,,rudder,,turn fin,,adjustable header so you can lay the pipe down inside,,pipe mount,,engine mount that has been drilled and tapped for a cmb 67,,this is a very nice kit,,i have just over a grand in it with all the hardware and labor,,my loss,,your gain,,700.00 shipped to lower 48 only,,any reasonable offer considered,,want to talk,,pm me your number or ask for my cell #,,thanks,,gary
paypal address is [email protected]
paypal address is [email protected]
Last edited by a moderator: