forresterace
Well-Known Member
- Joined
- Aug 14, 2002
- Messages
- 247
Castle has officially introduced the Phoenix HV (high voltage) controllers
http://www.castlecreations.com/
They are posted as being back-ordered for 2-3 weeks, however I saw the 85 amp model at my local electric specialist hobby shop today (he had already sold the 110 amp one that he had as well). It is a very impressive looking piece with its stacked boards and built-in heat sinks.
These should give Shultze and BK a real run in the high power end of things.
Lower prices and renowned customer service will, I'm sure, be a major factor.
http://www.castlecreations.com/
They are posted as being back-ordered for 2-3 weeks, however I saw the 85 amp model at my local electric specialist hobby shop today (he had already sold the 110 amp one that he had as well). It is a very impressive looking piece with its stacked boards and built-in heat sinks.
These should give Shultze and BK a real run in the high power end of things.
Lower prices and renowned customer service will, I'm sure, be a major factor.