Answers to all who have asked:
For the immediate future, I will be the source for the G-Drive. This is so that if any problems crop in the early stages of real-world use (beyond the initial testing), you can come back to me and we can work out the problems. As time goes by, I'm sure that some dealers might want to order the drive, but they probably won't be stocking more than one or two at a time.
The final weight figure that I come up with is 5 pounds and about 6 ounces, without a prop or pipe. From what Dave was saying about his SPP carbon fiber pipe, that and a prop should kick the total to about 6 pounds, give or take an ounce or so. I may undertake the challenge of making the drive lighter, but in all probability, I won't gain too much without a serious re-design. Considering that this process has now passed the 2-year mark in development, I'd like to hold off on any design changes for a while.
There is a steel pipe in the works. As I understand it, the design is a welded, formed steel unit of (as of now) unknown shape. It is still being tested and I have no idea as to the possible price or availability. I know Dave is working hard on his carbon fiber pipe and header, too.
As I stated in an earlier post, I am taking reservations for the first dozen production units. So far, I have 5 reservations. If you want to reserve a unit, send me a check for $50.00, or send me your Master Card or Visa Card number and I will charge $50.00 against it. The reservation is non-refundable if you cancel your order before I ship it. Frankly this is for a couple reasons. One reason is to defray the cost of the materials I have to buy to make them, and the second is to make sure that I have enough interest in the drive to make the large investment of my time worthwhile. After the first batch, I will probably still require some sort of deposit with an order, but I plan to wait and see on that issue. The approximate ship date for the first production units will be about May 1st, barring bad reports from the 7 people who will be field testing the prototypes. If all goes well, I will begin that batch in April. If I get some good reports right off, I may be inclined to move up the start date of the first production units.
Any questions, or to e-mail me about reserving a drive, please contact me at
[email protected]
Or, you can still call me at 607-687-0143. My mailing address is R Manufacturing Co, 570 DuBois Road, Owego, NY 13827 (USA) Make checks to FRED HOWE
And now, I'm goin' back to work on them drives. (LOL)
Fred