Intlwaters

Help Support Intlwaters:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
MVC-036F.JPG
Don Ferrette

MVC-036F.JPG

Here you can see the supplied machined Delrin motor mount is installed as well as the Jackrabbit Racing needle base fitted with the OS 3rd channel needle. Walt Barney stainless tank sitting up front ready to be plumbed when the motor gets here. The small black tube in the bottom corner just behind the rear motor mount nylon spacer is a carbon fiber tube epoxied in place to keep the fuel line nice & tightly tucked out of the way. The opposite side of tub that is not visible has the same tube for the pipe pressure line.
There are no comments to display.

Media information

Album
Blackbird 21 hydro build up
Added by
Don Ferrette
Date added
View count
1,174
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
14240-1204172365-MVC-036F.JPG
File size
73.5 KB
Dimensions
640px x 480px

Share this media

Back
Top