The bottom of each vertical wing gets slotted to fit over the previously installed aluminum angle brackets. Then they are marked & drilled from the side that faces the turbine tube, only thru to the slot & a little into the opposite side without penetrating the outside surface. The aluminum is then drilled to match the wings & tapped for the 6-32 nylon screws. This is a very study design but will break away when it needs to.