Intlwaters

Help Support Intlwaters:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
jag3build006.JPG
Don Ferrette

jag3build006.JPG

Both holes for stuffing tubes are now drilled in their proper location. Again check out the corner bracing at the bulkheads. Also note the "factory installed" carbon veil on the floorboard areas of the tank and engine wells. I talked Bob into doing this for me before the rear boom tube block and bulkheads went in so it could be one continuous piece. He admitted later that doing it that way made it much easier.
There are no comments to display.

Media information

Album
Jaguar III twin build up
Added by
Don Ferrette
Date added
View count
1,054
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
16311-1262011390-jag3build006.JPG
File size
63.3 KB
Dimensions
640px x 480px

Share this media

Back
Top