Intlwaters

Help Support Intlwaters:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
jag3build005.JPG
Don Ferrette

jag3build005.JPG

With the rear hardware mounted and steering pushrod holes drilled it's time to begin prepping for the stuffing tube installation. The location for the holes in the engine well wall are marked and ready to drill once the motors come back out. I think I checked and re-checked this part about 3 times as there is no second chance here.
There are no comments to display.

Media information

Album
Jaguar III twin build up
Added by
Don Ferrette
Date added
View count
937
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
16310-1262011074-jag3build005.JPG
File size
59.5 KB
Dimensions
640px x 480px

Share this media

Back
Top