With the tape now removed you can see how cleanly both tubes exit the bottom of the tub and the taping prevented any excessive epoxy bleed through. Also note that the drain holes are already drilled in their respective positions. I always try to be sure all holes get drilled before tub is sealed. Can't tell you how many paint jobs I've seen ruined from where people drilled holes after painting and then the paint lifts from nitro and oils wicking into the exposed end grain.